Lined Tunnel Construction in Saturated Ground

Software

Version Notes:
FLAC 8.0

Level: Advanced
Runs in Demo: No

Write Up
Walk Through
Project Files
Consulting Services

A circular lined tunnel is constructed in saturated ground. The ground is dewatered during construction. The tunnel is supported by a temporary shotcrete liner, which is installed while the tunnel excavation is advanced. A final cast-in-place concrete liner is then constructed. The water level is then returned to the original level. The analysis determines the forces and moments that develop in the concrete liner when the water level is returned to the original level, and when the temporary shotcrete liner loses strength.

Keywords:

  • Circular
  • Tunnel
  • Saturated soil
  • Dewatering
  • shotcrete
  • concrete
  • liner

Materials:

  • Concrete
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
Latest News
  • Itasca has announced the release of FLAC2D v9 Itasca has announced the release of FLAC2D v9, revolutionizing the way we analyze and predict...
    Read More
  • 6th Itasca Symposium on Applied Numerical Modeling The next Itasca Symposium will take place June 3 - 6, 2024, in Toronto, Canada....
    Read More
  • Itasca International Inc. announces the Selection of its New CEO Itasca International Inc. announces the Selection of its New CEO ...
    Read More

Upcoming Events
23 Sep
Getting Started with FLAC2D/FLAC3D
This training is an introduction to continuous modeling with FLAC2D and FLAC3D. At the end of the course, participants will master the ... Read More
14 Oct
Getting Started with 3DEC
Live Online Introductory Training Course. October 14-15, 2025... Read More
2 Dec
NEW TRAINING: Meshing in ITASCA Software
This introductory training course offers a comprehensive foundation in geotechnical modeling, enabling participants to identify various... Read More