Dewatering

Itasca can estimate the dewatering needs of a construction site or mine to temporarily lower groundwater levels below the natural groundwater level, in all seasons, to provide for safe excavation construction and working environment during operations. Itasca can predict dewatering rates, including numerical modeling to estimate dewatering and design and optimize the dewatering and water-disposal systems, drain holes, and monitoring wells.

Latest News

Upcoming Events
1 Oct
FLAC3D 7.0 Introductory training course
... Read More
14 Oct
Focused Seismic and Liquefaction Training 2019
... Read More
26 Nov
FLAC3D V7.0 Training Course November 2019
FLAC3D TMis a numerical modeling code for advanced geotechnical analysis of soil, rock, and structural support in three dimensions. FLA... Read More